// site header // site bdy

SNIAM

The building was completed in 2001. It contains 5 storeys above ground plus a basement level. I

Location: Main Campus (Pearse Street side)

Accessibility rating: Building is accessible at all levels

Opening hours

SNIAMS is open from 8am to 6pm daily with after hour's access available through key entry.

Evacuation information

  • Evac Chair is on 2nd floor, middle stairs

  • The Lift in the building is protected from the effects of a fire and can be isolated from external control

Building description

The building was completed in 2001. It contains 5 storeys above ground plus a basement level. In the basement there are laser research rooms, a large lecture hall, offices and storage rooms. The Ground Floor contains labs, offices, and the workshop and conference rooms. The 1st to 4th floors house the larger labs; researcher's and staff offices, common room and storage rooms. Floor 5 contains the plant room.

Facilities available

  • Lecture Halls
  • Science Labs
  • Lasers Rooms
  • Offices
  • Workshop
  • Chemical Stores
  • Common Area's
  • Evac Chair is on 2nd floor, middle stairs